Building a deck in Goshen...
![](http://photos1.blogger.com/blogger/1355/3096/200/DSC00621.jpg)
![](http://photos1.blogger.com/blogger/1355/3096/200/DSC00622.0.jpg)
We had a couple beer outside, but it kept raining, so we moved inside to the sound of a fire and a wind-up powered radio.
![](http://photos1.blogger.com/blogger/1355/3096/320/DSC00651.jpg)
Terri, Brandon and Meghan
The next day... time to start building. First went up the cribbing. Keith Mike and Nathan
Brandon
Mike and Meghan Fishing
Then the framework. Did a little fishing.
Brandon, Keith and Mike
Then the decking. We said we wouldn't drink until the decking started.
Me chopping a tree
Nathan towed Meg out on the raft then left her... haha
Then the rest of the crew showed up and we had a good fire, told some lies and went to bed (3am).
Overall it was a great weekend, we used every last drop of wood, just have to build a handrail and a set of stairs. If you ever need a deck built in a day... please call someone else.
The finished deck.
No comments:
Post a Comment